Real Field Investigations & Pest Audits

GPM Technical Case Studies & Field Audits

Discover how our technical supervisors solve complex subterranean termite infestations, locate hidden breeding queens, and eliminate persistent pest problems where conventional treatments fail.

Deep Investigation Case #2019-07 📍 Village Lakshiaan, 12 km from Mahilpur, Distt. Hoshiarpur

Discovery & Eradication of 3rd-Floor Subterranean Queen Colony in a Newly Built Kothi

Initial Site Context: In July 2019, GPM Pest Management was commissioned to perform post-construction anti-termite treatment with a 5-year written warranty for a newly constructed, luxurious 3-story residential kothi in Village Lakshiaan, Hoshiarpur. A crew of 2 certified technicians led by a senior field supervisor commenced the drill-fill procedure.

The Critical Field Dilemma: After two days of extensive skirting drilling across the ground and first floors, the supervisor reported in the morning that treatment was nearly finished—except for the built-in modular cupboards on the 3rd floor. The house dwellers were extremely reluctant to unpack and vacate their wardrobes, stating that termites could not possibly be present on the top floor of a new house.

Strict GPM Protocol: Chairman Ajay Kumar Sharma provided uncompromising instructions: "GPM will issue a 5-year warranty card ONLY if 100% of the property—including 3rd-floor cupboards—is inspected and treated." The supervisor politely explained our quality policy to the owner.

Termite colony nest inside wooden wardrobe cupboard Hoshiarpur

The Discovery

Within one hour of opening the rear paneling of the 3rd-floor cupboard, the supervisor discovered: An active, massive reproductive termite colony—complete with a pulsating egg-laying queen and thousands of nursery alates—had established itself directly behind the top-floor woodwork! Termites had climbed internal electrical conduits through continuous vertical cavities from the soil.

Resolution: The entire colony was directly injected with Bayer Premise non-repellent emulsion. Because GPM insisted on rigorous protocol adherence rather than taking easy shortcuts, the homeowner was saved from catastrophic structural collapse of their roof-timber trusses and 3rd-floor ceiling paneling.

Completed Kothi Verification

Finished House Protection & Woodwork Inspection | Video Proof

Comprehensive inspection of completed residential kothis after GPM anti-termite treatment, preserving wooden wardrobes, door frames, and interior finishes.

Hospital Bio-Safety Audit

Punjab Institute of Medical Sciences (PIMS), Jalandhar

Problem: German cockroach infestation in hospital dietary pantries risking bacterial contamination near sterile ICU wings where aerosol chemical spraying was prohibited by clinical safety guidelines.

Solution: Nighttime deployment of non-volatile micro-dot gel matrices (Indoxacarb/Fipronil) combined with crack-and-crevice bait stations. 100% eradication achieved in 10 days with zero airborne drift.

Institutional Timber Defense

Beant College of Engineering & Technology (BCET), Gurdaspur

Problem: Subterranean deemak attack ravaging historical teakwood door frames and institutional archives situated on moisture-rich subsoil near water channels.

Solution: High-pressure chemical drill-fill perimeter drenching with deep timber micro-injections. Halted structural damage completely across all affected academic wings.

Call Now